← Back to projects
Project evidence

Upper Elehera Canal Project, Sri Lanka

Undertook hydrogeological and geophysical investigations to assess subsurface conditions and groundwater potential for the design and construction of 26 dewatering deep tube wells associated with the Upper Elahera Canal Project. The investigation was conducted along the tunnel access route between chainages 33+400 and 33+900, covering the Sigiriya and Diyakepilla areas, during the period of 8–21 April 2025

Selected
Thumbnail 0Thumbnail 1Thumbnail 2Thumbnail 3
Technical pathway

How GeoNeeds turns site data into decisions.

01

Field assessment

Site conditions, access, surface indicators, and survey priorities are reviewed before interpretation.

02

Subsurface reading

Geophysical and hydrogeological observations are translated into practical site intelligence.

03

Action report

Recommendations are prepared for drilling, water management, or additional technical testing.